Trillium Cove

dylanwebb

 

 

Trillium Cove, located in Prior Lake, consists of 142 Single Family lots and 65 Multi-Family lots.  Enebak Construction was contracted to complete the grading, underground utilities, and street construction.  Enebak’s grading and utility crews worked side by side to ensure the streets would be constructed before winter.

The work consisted of:

Grading

  • 467,889 CY Common Excavation
  • 87,506 CY Soil Correction
  • 90,380 CY of Export
  • 31,075 CY of Trench Borrow for street sand

Utilities

  • 9,189 LF Sanitary Sewer
  • 12,368 LF Watermain
  • 10,549 LF Storm Sewer

“Enebak Construction continues to be a preferred contractor that can handle any job.  Trillium Cove had significant challenges with topography and excess dirt and Enebak was able to put a plan together to meet our deadlines and allow for contract savings.  Enebak takes pride in their work and communicates effectively to make sure the owner is always informed of job progress and budget.  Enebak Construction is a complete package that you can trust to get the job done!”

-Chad Onsgard
 Pulte Group
 Director of Development
 Minnesota Division