Flying Cloud Landfill

kristakoch

Enebak Construction was contracted to consolidate waste that was piled 30-100 feet deep and reduce the overall landfill footprint. This involved removing the trash down to natural ground, installing a 40 millimeter thick synthetic cover liner, and a gas ventilation system. Due to nearby houses and businesses, dust and odors had to be kept to a minimum at all times. … Read More

Washington County Landfill

kristakoch

The existing 2 Million cubic yards of waste was contaminating underlying soil and groundwater with hazardous chemicals. Enebak Construction was contracted to excavate the waste, install proper liners and soil cover, and to install vertical wells for gases to escape. Enebak Construction completed the project an entire year before contract requirements, largely in part to value engineering. The landfill’s footprint … Read More

County Road 21

kristakoch

Once open fields and trees, County Road 21 provides commuters with a better route to Highway 169 in Shakopee, Minnesota. The major challenges of this project involved bypassing an existing 42” sanitary sewer line. Major Work: 3 Miles of 4 Lane Divided Highway Site Grading: 1.2 Million Cubic Yards of Excavation Bypass of a 42” Sanitary Sewer Line Over 32,000 … Read More